Methods and apparatuses for controlling timing paths and latency based on a loop delay

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9508417
APP PUB NO 20150235691A1
SERIAL NO

14185194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses and methods for controlling timing circuit locking and/or latency during a change in clock frequency (e.g. gear down mode) are described herein. An example apparatus may include a timing circuit. The timing circuit may be configured to provide a clock signal to the forward path, adjust a rate of the clock signal responsive to receipt of a command to adjust the rate of the clock signal, select a feedback clock signal responsive to a loop delay of the timing circuit, and provide a control signal to an adjustable delay circuit of the forward path circuit. Another example apparatus may include a forward path configured to delay a signal based at least in part on a loop delay and a latency value, and a latency control circuit configured to provide an adjusted latency value as the latency value responsive to receipt of a command, wherein the forward path is configured to operate at least in part at an adjusted clock rate responsive to receipt of the command.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwak, Jongtae Boise, US 65 1076

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00