Power-on reset circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9369123
APP PUB NO 20150236688A1
SERIAL NO

14336791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power-on reset circuit of one embodiment includes first and second power supplies, first and second detecting circuit, a differentiation circuit, a current mirror circuit and a latch circuit. The second power supply is generated from a voltage of the first power supply and supplies a voltage lower than the first power supply. The first detecting circuit detects rise of a voltage of the second power supply. A current corresponding to a change in potential of the first power supply flows through the differentiation circuit. The current mirror circuit multiplies the current flowing through the differentiation circuit. The second detecting circuit senses stoppage of output current of the current mirror circuit and detects completion of the rise of the voltage of the first power supply. The latch circuit is reset by an output signal of the first detecting circuit and set by an output signal of the second detecting circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Masahiro Kanagawa-ken, JP 225 2427

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00