Electrolytic apparatus, system and method for the efficient production of nitrogen trifluoride

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528191
APP PUB NO 20150240367A1
SERIAL NO

14560023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrolytic cell which is partitioned into one or more anode chambers and cathode chambers by one or more partition walls between each anode chamber and cathode chamber, wherein each anode chamber comprises one or more anodes comprising an inner surface and an outer surface, and each cathode chamber comprises one or more cathodes, wherein the anode chamber and the cathode chamber are configured such that any one of the one or more cathodes is adjacent to the outer surface of the one or more anodes and there is no cathode adjacent to the inner surface of the one or more anodes; a molten salt electrolyte surrounding the one or more anodes and the one or more cathodes; at least one anode gas outlet for withdrawing gas from the anode chamber; and at least one cathode gas outlet for withdrawing gas from the cathode chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSUM MATERIALS US LLC8555 S RIVER PARKWAY TEMPE AS 85284

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hart, James Joseph Fogelsville, US 9 44
Krouse, Steven Arnold Tamaqua, US 4 140
Machado, Reinaldo Mario Allentown, US 27 257
Nehlsen, James Patrick East Stroudsburg, US 7 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00