Method and apparatus for combustion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9857075
SERIAL NO

14424523

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustor for providing homogeneous combustion of liquid fuels includes an essentially tube shaped combustion body, including a combustion chamber having a plurality of reaction zones, one of which is an injection zone, the others being combustion zones for staged homogeneous combustion of evaporated fuel and air. A swirler, including a base and swirler elements, is configured to operate at a swirl number between 0.6-2.5 in combination with a flow constriction plate whose size is such that the ratio of the open diameter (De) of the constriction to the diameter (D) of the combustion body is <0.7 and the constrictor plate is placed at a distance (L1) from the base of the swirler base so that L1/De>1. A primary mixing plate is placed downstream from the constriction plate at a distance (L2) so that the ratio L2/L1<1 to allow maximum mixing of the homogeneous combustion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REFORMTECH HEATING HOLDING AB164 40 KISTA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beneyto, Satorres Paula Solna, SE 3 3
De, Groote Frank Pieter Jannis Vallentuna, SE 1 0
Lindstrom, Bard Johanneshov, SE 6 6
Logdberg, Sara Saltsjo-boo, SE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00