Front suspension structure for saddle riding type vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9359037
APP PUB NO 20150274249A1
SERIAL NO

14663838

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A front suspension structure includes a head pipe; an upper arm portion having a front end portion connected to the head pipe rockably about a first coupling axis and a rear end portion connected to a vehicle body frame rockably about a second coupling axis; and a lower arm portion disposed below the upper arm portion, and having a front end portion connected to the head pipe rockably about a third coupling axis and a rear end portion connected to the vehicle body frame rockably about a fourth coupling axis. The structure includes a cushion unit making a lower end portion perform a stroke as the lower arm portion rocks; the lower end portion supported in front of a middle point of a segment connecting the third coupling axis to the fourth coupling axis, and an upper end portion supported in a rear of the second coupling axis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikawa, Jun Wako, JP 125 1434
Kuwabara, Naoki Wako, JP 29 161
Toda, Munehiro Wako, JP 7 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00