Aircraft ground support vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9666889
SERIAL NO

14662543

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a power management system of an aircraft ground support vehicle. The power management system includes a power production control module in communication with a fuel cell system of the aircraft ground support vehicle to control production of electrical power by the fuel cell system. The fuel cell system may be configured as a sole source of power to directly power a traction system of the aircraft ground support vehicle and to provide electrical power to an auxiliary power output of the aircraft ground support vehicle. The power management system further includes a power distribution control module in communication with the fuel cell system to control distribution of the electrical power between the traction system and the auxiliary power output. The aircraft ground support vehicle may include a chassis, the traction system, the auxiliary power output, the fuel cell system, and the power management system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PARKER INTANGIBLES LLC6035 PARKLAND BOULEVARD CLEVELAND OH 44124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brierley, Scott Carlsbad, US 3 10
Loignon, Michel Laguna Beach, US 3 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00