Achieving power supply and heat dissipation (cooling) in three-dimensional multilayer package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10169504
APP PUB NO 20150278417A1
SERIAL NO

14740906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer-implemented structure for optimizing a route for power supply and heat dissipation in a multilayer chip. The method includes: setting a heat conductive thermal value for the multilayer chip by way of density, preparing a substrate that contains silicon where a wiring layer is formed facing the upper surface side of the multilayer chip, setting the power from the wiring layer of the substrate that uses silicon, manipulating the value of the power supply, and manipulating the heat conductive thermal value based on density. Both apparatus's include an organic substrate, a multilayer chip, a substrate containing silicon, a wiring layer, and a heat dissipater, wherein the components are configured to perform the steps of the above method. The method of configuring an apparatus ensures that all the multilayer chips are stored in the concave part of the organic substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Keiji Kanagawa-ken, JP 163 1064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00