Power source conversion module, power supply apparatus and power supply method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10014715
SERIAL NO

14738164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply apparatus including: N+m power source conversion modules, where N power source conversion modules are main power source conversion modules; a power source conversion module includes a detection and switching unit and a conversion unit, where the detection and switching unit is separately connected to an output end of a first alternating current power source and an output end of a second alternating current power source, and the detection and switching unit is configured to monitor in real time a working state of the first alternating current power source and a working state of the second alternating current power source, close a channel between the conversion unit and one power source, which is in a normal working state, of the first alternating current power source and the second alternating current power source.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Qingyin Shenzhen, CN 30 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00