Precoding matrix codebook design and periodic channel state information feedback for advanced wireless communication systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9667328
SERIAL NO

14658910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Channel quality indicator (CQI) and precoding feedback from a user equipment includes reporting of at least a first and a second precoding matrix indicator (PMI). First, second and third indices are determined based upon the first and the second PMI and third and fourth PMI and are employed to select the precoding matrix. The selected precoding matrix includes a first column comprising a first row partition and a second row partition, where the first row partition is a Kronecker product of at least first and second precoding vectors and the second row partition is a Kronecker product of a first term and a second term. The first term is a product of a co-phasing factor and the first precoding vector and the second term is the second precoding vector. The first precoding vector is selected from a first codebook and the second precoding vector is selected from a second codebook.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nam, Young-Han Plano, US 240 9535
Xin, Yan Princeton, US 204 1702

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00