Vibration motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800115
SERIAL NO

14557610

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vibration motor includes an eccentric weight whose center of gravity is positioned outside a shaft and a holder made of resin and holding a ring-shaped back yoke and the eccentric weight. The back yoke includes an overhang portion which extends farther inward in a radial direction than an inner side edge of the opening of a rotor magnet. The holder includes a penetrated portion which is a tube-shaped portion positioned at an axially inner side of the rotor magnet and extends in the axial direction surrounding the shaft, an upper surface portion which expands radially outwardly from an upper side of the penetrated portion to cover an upper surface of the eccentric weight, and a lower surface portion which expands radially outwardly from the lower side of the penetrated portion to cover a lower surface of the overhang portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIDEC SEIMITSU CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoi, Takayuki Ueda, JP 11 58
Kiuchi, Hiroyuki Ueda, JP 10 80
Yamaguchi, Tsuyoshi Ueda, JP 92 776

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00