Upstream contention measurement reporting and mitigation in DOCSIS remote PHY network environments

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692563
SERIAL NO

14680873

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example method for upstream contention measurement and reporting in Data Over Cable Service Interface Specification (DOCSIS) remote physical layer (R-PHY) network environments is provided and includes receiving, at a Converged Cable Access Platform (CCAP) core from a R-PHY node over a converged interconnect network (CIN) in the DOCSIS R-PHY network environment, an indication of a collision level in an upstream network between the R-PHY node and a plurality of cable modems (CMs), calculating a congestion level in the upstream network based on the collision level indicated by the R-PHY node, adjusting back-off window parameters for cable modem retransmissions based on the calculated congestion level, and adjusting a contention transmission opportunity density in a downstream Media Access Protocol (MAP) message based on the adjusted back-off window parameters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CISCO TECHNOLOGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Hang Plano, US 171 2884
Liu, Tong Acton, US 239 2405

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00