Method for manufacturing a structural element having a variable thickness for aircraft production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10196722
APP PUB NO 20150299837A1
SERIAL NO

14439300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to the method for manufacturing a rolled product of variable thickness made of heat-treatable aluminum alloy in which hot rolling is performed to achieve a variation in thickness of at least 10% lengthwise between the thickest part and the thinnest part; the rolled product of variable thickness obtained undergoes solution heat-treatment and quenching with permanent set of at least 1% in the thickest part before natural or artificial ageing. The products obtained according to the invention exhibit improved mechanical strength of at least 5% in the thinnest part and improved fracture toughness of at least 15% in the thickest part. The products according to the invention are notably useful in the fabrication of aircraft upper or lower wing skins the “buy to fly” ratio and the properties are simultaneously improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONSTELLIUM FRANCEPARIS FRA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danielou, Armelle Les Echelles, FR 19 98
Ehrstrom, Jean-Christophe Grenoble, FR 22 113
Warner, Timothy Corenc, FR 45 531

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00