Method and device for micro blasting with reusable blasting rods and electrically ignited cartridges

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10801818
APP PUB NO 20150308796A1
SERIAL NO

14261432

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus, method and system to electrically ignite small explosive cartridges in boulders, bedrock, concrete etc. to split or shape them. A propellant or explosive charge is electrically ignited directly by an inert electrical igniter inserted therein that melts at high temperature a bridge wire(s) or ribbon(s) with AC or DC electrical current. The bridge melts normally at over 2,000 degrees F. which will ignite the propellant or explosive. With sufficient voltage and amperage such as 110 volt AC wall current ionization takes place along the pathway of the melting bridge, which melts at approximately 2,000 degrees F., and a large electrical arc forms at approximately 5,000 degrees F. that more reliably ignites the propellant or explosive with increased blast power. A reusable blasting rod includes an external groove for a blasting wire, a counterweight for better tamping, which has a cradle for heavy objects to utilize the Newton Kinetic effect.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLEN DANA RAYMONDRENO NV

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, Dana Raymond Reno, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00