Gas separation material using metal complex and gas separation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9580446
APP PUB NO 20150329563A1
SERIAL NO

14443573

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A separation material and method for separating and recovering a target gas from a mixed gas including the target gas and a hydrocarbon gas that has the same number of carbon atoms as the target gas, the target gas being a hydrocarbon gas having 2 or 4 carbon atoms and a carbon-carbon double bond. This gas separation material includes: a metal complex containing a 2,3-pyrazinedicarboxylic acid; an ion of at least one type of metal (M); and an organic ligand (B) capable of bidentate coordination to the metal ion represented by general formula (1) or general formula (2), where (M), formula (1) and formula (2) are as defined herein. The metal complex has a composition represented by M2+2A2−2B where M2+ is the ion of the metal (M), A2− is a 2,3-pyrazinedicarboxylate dianion and B is the organic ligand (B) capable of bidentate coordination to the metal ion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHOWA DENKO K.K.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kishida, Keisuke Oita, JP 5 15
Watanabe, Yoshihiro Oita, JP 237 3081

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00