Hydrogen production process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9457334
APP PUB NO 20150336075A1
SERIAL NO

14759104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a hydrogen production process, which is capable of producing hydrogen, which is a clean source of energy, simply and conveniently without using conventionally-used ammonia, with an extremely high level of safety. In accordance with the present invention, hydrogen is produced by substituting hydrogen for free oxygen in mayenite (Ca24Al28O644+.2O2−) to obtain hydrogen-substituted mayenite (Ca24Al28O644+.4H) and reacting the resultant hydrogen-substituted mayenite (Ca24Al28O644+.4H) with water to produce hydrogen, and hydrogen is produced by substituting hydrogen for free oxygen in mayenite (Ca24Al28O644+.2O2−) to obtain hydrogen-substituted mayenite (Ca24Al28O644+.4H), irradiating the resultant hydrogen-substituted mayenite (Ca24Al28O644+.4H) with ultraviolet rays to obtain conductive mayenite (Ca24Al28O644+.4e), and reacting the resultant conductive mayenite (Ca24Al28O644+.4e) with water to produce hydrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI ZOSEN CORPORATION;KYOTO UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Toshimi Kyoto, JP 27 313
Hikazudani, Susumu Osaka, JP 38 125
Hirao, Kazuyuki Kyoto, JP 35 231
Nakamoto, Junko Kyoto, JP 16 114
Visbal, Mendoza Heidy H Kyoto, JP 1 1
Wakui, Atsushi Osaka, JP 6 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00