Engine fastener for an aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9573694
APP PUB NO 20150336678A1
SERIAL NO

14719583

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine fastener for an aircraft, to secure an engine to a pylon and comprising a fastener body fixed to the pylon and having a cylindrical extension, and a fixing assembly comprising a paddle fixed to the engine and a connection arrangement joined to the paddle and arranged on the cylindrical extension to form a ball-and-socket joint between the cylindrical extension and the paddle. The connection arrangement comprises a ball, formed in one piece, having a central bore in which the cylindrical extension fits, and of which the outer surface is a spherical portion, a fixing element fixing the ball on the cylindrical extension, and two cages, each having an inner surface assuming the form of a spherical portion. The two inner surfaces are arranged opposite one another to house the ball, and for each cage, a joining element joins the cage to the paddle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS OPERATIONS SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cassagne, Jerome Toulouse, FR 12 163
Cousin, Antoine L'Union, FR 9 27
Deforet, Thomas Toulouse, FR 30 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00