Method for conducting combustion in a furnace in order to limit the production of nitrogen oxides, and installation for implementing said method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10001274
SERIAL NO

14409797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for conducting combustion in a fluidized bed furnace, in particular having a sand bed, according to which a flow of primary combustion air is blown through the bed, the fuel consisting in particular of organic waste, or of municipal waste, or of sludge from purifying stations, it being possible to inject secondary air (5a) into the space (5) in the furnace located above the bed; in order to limit the production of nitrogen oxides NOx and nitrous oxide N2O: the nitrous oxide N2O and nitrogen oxide NOx content of the fumes at the outlet of the furnace are measured (12, 20); the temperature of the fluidized bed is controlled to keep it at the highest admissible value at which the production of nitrous oxide N2O is substantially reduced, while the production of nitrogen oxides NOx is not substantially increased; and the excess air in the fluidized bed is controlled to keep it at the lowest admissible value at which the production of nitrogen oxides NOx is reduced without adversely affecting the combustion and the temperature of the bed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEGREMONT92500 RUEIL-MALMAISON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morice, Ludovic Chaumont en Vexin, FR 4 6
Pardo, Pierre-Emmanuel Orsay, FR 8 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00