Polar, chiral, and non-centro-symmetric ferroelectric materials, memory cells including such materials, and related devices and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10242989
APP PUB NO 20150340372A1
SERIAL NO

14282520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ferroelectric memory device includes a plurality of memory cells. Each of the memory cells comprises at least one electrode and a ferroelectric crystalline material disposed proximate the at least one electrode. The ferroelectric crystalline material is polarizable by an electric field capable of being generated by electrically charging the at least one electrode. The ferroelectric crystalline material comprises a polar and chiral crystal structure without inversion symmetry through an inversion center. The ferroelectric crystalline material does not consist essentially of an oxide of at least one of hafnium (Hf) and zirconium (Zr).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bi, Lei Chengdu, CN 37 202
Chavan, Ashonita A Boise, US 44 432
Meade, Roy E Boise, US 42 407
Pandey, Sumeet C Boise, US 41 468
Tao, Qian Boise, US 100 812

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00