Nuclear reactor nozzle repair method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10026512
APP PUB NO 20150348658A1
SERIAL NO

14655111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nozzle repair method and a nuclear reactor vessel include: removing a trepanning portion (208) as a connection portion with respect to an in-core instrumentation cylinder (204) in a groove-welding portion (206); removing the in-core instrumentation cylinder (204) from a lower end plate (66); forming a plug attachment opening (211) by removing the groove-welding portion (206); applying a pressing load to the lower end plate (66) by attaching a plug (212) to the plug attachment opening (211); and welding and fixing the plug (212) attached to the plug attachment opening (211). Accordingly, since a repair is easily performed, it is possible to improve the workability and to decrease a repair cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTDCHIYODA-KU TOKYO 100-8332

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishimura, Tsuyoshi Tokyo, JP 25 253
Sakashita, Hideshi Tokyo, JP 7 14
Sato, Tomonobu Tokyo, JP 7 81
Yamamoto, Akio Tokyo, JP 196 3818
Yamamoto, Takeshi Tokyo, JP 702 5468

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00