Brake control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9487191
APP PUB NO 20150360654A1
SERIAL NO

14761562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The brake control device applied to a hydraulic pressure braking force generating device having a driving hydraulic pressure generating device and a pilot hydraulic pressure generating device. The brake control device includes a judging portion which judges whether or not an operating amount of a brake operating member is equal to or less than a predetermined value and a pilot hydraulic pressure control portion which controls the pilot hydraulic pressure generating device to generate a preparatory hydraulic pressure in the pilot hydraulic pressure chamber which is larger than an atmospheric pressure set to a value so that a hydraulic pressure in the wheel cylinder is kept substantially to an atmospheric pressure level when the judging portion judges that the operating amount of the brake operating member is equal to or less than the predetermined value to suppress occurrence of brake dragging during non-braking operation with keeping the braking force responsiveness.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ADVICS CO., LTD.;TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamiya, Yusuke Okazaki, JP 55 274
Komazawa, Masaaki Miyoshi, JP 33 213
Masuda, Yoshio Anjyo, JP 39 223
Niino, Hiroaki Toyota, JP 96 992
Uchida, Kiyoyuki Konan, JP 35 368

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00