Configurable liquid precursor vaporizer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10107490
APP PUB NO 20150377481A1
SERIAL NO

14320371

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved vaporizer for vaporizing a liquid precursor is provided. The vaporizer may include one or more channels with a relatively large wall-area-to-cross-sectional-flow-area ratio and may be equipped with one or more heater elements configured to heat the channels above the vaporization temperature of the precursor. At least some of the channels may be heated above the vaporization temperature but below the Leidenfrost temperature of the precursor. In some implementations, a carrier gas may be introduced at high speed in a direction generally transverse to the precursor flow to mechanically shear the precursor into droplets. Multiple vaporizers may be ganged together in series to achieve complete vaporization, if necessary. The vaporizers may be easily disassembleable for cleaning and maintenance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamilton, Shawn M Boulder Creek, US 9 172
Lorelli, Jeffrey E Fremont, US 4 96
Madrigal, Kevin Santa Cruz, US 7 102
Schoepp, Alan M Ben Lomond, US 39 1433
Smith, Colin F Half Moon Bay, US 11 672
Sung, Edward Sunnyvale, US 13 70
te, Nijenhuis Harald San Jose, US 13 956

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00