Method of generating a drill hole sequence plan and drill hole sequence planning equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11073000
APP PUB NO 20160003009A1
SERIAL NO

14770149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Drill hole sequence planning equipment (14) includes a position determining module (18) for determining an initial location of a mobile drill rig (12). A selection module (24) selects a destination location for the drill rig (12). A corridor establishment module (26) establishes a corridor between the initial location of the drill rig (12) and its destination location, the corridor having a selected width. A processing unit (28) is responsive to the modules (18, 24 and 26) for selecting a hole location of each hole within the corridor to be drilled by the drill rig (12) sequentially as it moves from its initial location to its destination location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNOLOGICAL RESOURCES PTY LTDMELBOURNE VIC 3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oppolzer, Florian Brisbane, AU 7 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00