Gaming system, gaming device and method providing a first game and a plurality second wagering games each associated with a separate activatable component of the first game

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9978201
SERIAL NO

14852027

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gaming system having a first skill, partial skill, or pseudo skill based game having a plurality of individually activatable designated components and a plurality of second chance based games each respectively associated with a different one of the individually activatable components of the skill based game. When each designated component of the first game is activated through one or player inputs, a corresponding chance based game associated with that designated component is activated. Each chance based game randomly determines whether the player wins an award. In one embodiment, the likelihood of activating each designated component is different and the chance based game associated with each different designated component is different.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IGT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baerlocher, Anthony J Henderson, US 666 76621
De, Waal Daniel J Las Vegas, US 21 632
Filipour, Cameron A Las Vegas, US 52 2196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00