Systems and methods for improving deposition rate uniformity and reducing defects in substrate processing systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9617637
SERIAL NO

14331704

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for delivering liquid precursor in a substrate processing system include supplying liquid precursor using a first valve in fluid communication with a liquid precursor source; supplying purge gas using a second valve in fluid communication with a purge gas source; arranging a third valve having a first input port in fluid communication with an output port of the first valve and a second input port in fluid communication with an output port of the second valve; arranging an input port of a first divert injector valve in fluid communication with an output port of the third valve; and operating the first valve, the second valve, the third valve and the first divert injector valve in first, second, third and fourth modes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dhas, Arul Sherwood, US 4 276
Guiliani, Jaswinder Beaverton, US 1 264
Kelley, Brannon Sherwood, US 1 264
Singhal, Akhil Beaverton, US 28 1040

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00