Electronic device console with natural draft cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10834808
APP PUB NO 20160021731A1
SERIAL NO

14867413

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic device console includes a console body that houses a chip package, and a duct extending from the console body. An interior volume of the duct is in fluid communication with an interior volume of the console body. A first vent is at a distal end of the duct. A second vent is in a wall of the console body. The console may be oriented in a first orientation and a second orientation. The duct functions as a chimney for natural convection cooling of the chip package when the console is oriented in the first orientation. The console body functions as a chimney for natural convection cooling of the chip package when the console is oriented in the second orientation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bodenweber, Paul F Kingston, US 23 76
Casey, Jon A Poughkeepsie, US 63 960
Lian, Chenzhou Poughquag, US 12 53
Rivera, Kathryn C Hopewell Junction, US 10 140
Sikka, Kamal K Poughkeepsie, US 94 725

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 10, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 10, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00