Method for manufacturing interconnect structures incorporating air gap spacers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9613851
SERIAL NO

14846800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dual damascene article of manufacture comprises a trench containing a conductive metal column where the trench and the conductive metal column extend down into and are contiguous with a via. The trench and the conductive metal column and the via have a common axis. These articles comprise interconnect structures incorporating air-gap spacers containing metal/insulator structures for Very Large Scale Integrated (VLSI) and Ultra Large Scale Integrated (ULSI) devices and packaging. The trench in this regard comprises a sidewall air-gap immediately adjacent the side walls of the trench and the conductive metal column, the sidewall air-gap extending down to the via to a depth below a line fixed by the bottom of the trench, and continues downward in the via for a distance of from about 1 Angstrom below the line to the full depth of the via. In another aspect, the article of manufacture comprises a capped dual damascene structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nitta, Satya V Armonk, US 35 745
Ponoth, Shom Armonk, US 240 3542

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00