Electrical connector between die pad and z-interconnect for stacked die assemblies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9508689
APP PUB NO 20160027761A1
SERIAL NO

14871185

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for forming connectors on die pads at a wafer level of processing include forming spots of a curable electrically conductive material over die pads and extending to or over the interconnect die edge; curing the conductive material; and in a wafer cutting procedure thereafter severing the spots. Also, die pad to z-interconnect connectors formed by the methods, and shaped and dimensioned accordingly. Also, stacked die assemblies and stacked die packages containing die prepared according to the methods and having die pad to z-interconnect connectors formed by the methods and shaped and dimensioned accordingly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENSAS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barrie, Keith L Capitola, US 2 22
Bray, John R San Jose, US 2 22
Co, Reynaldo Santa Cruz, US 36 1245
Del, Rosario Elmer M San Jose, US 2 22
Leal, Jeffrey S Scotts Valley, US 13 329
McGrath, Scott Scotts Valley, US 26 611
Melcher, De Ann Eileen San Jose, US 3 8
Pangrle, Suzette K Cupertino, US 71 1268
Villavicencio, Grant Scotts Valley, US 12 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00