Supply system and method for providing electric energy, oxygen depleted air and water as well and aircraft having such a supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10173086
APP PUB NO 20160030781A1
SERIAL NO

14808273

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supply system for providing at least oxygen depleted air and water in a vehicle includes a catalytic converter, at least one hydrogen supply means, at least one air supply means, at least one outlet for oxygen depleted air, and a control unit coupled with the catalytic converter. The catalytic converter is couplable with the hydrogen supply means and is adapted for producing water under consumption of hydrogen from the at least one hydrogen supply means and oxygen. The catalytic converter is further couplable with the at least one air supply means for additionally producing oxygen depleted air. Further, the control unit is adapted for selectively operating the catalytic converter based on a demand of water and oxygen depleted air.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS OPERATIONS GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffjann, Claus Hamburg, DE 65 871
Klewer, Guido Hamburg, DE 11 46
Lüdders, Hauke-Peer Hamburg, DE 4 20
Law, Barnaby Hamburg, DE 14 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 8, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 8, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00