DC connection system for renewable power generators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9800054
APP PUB NO 20160036221A1
SERIAL NO

14448294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A DC connection system for renewable power generators includes a first monopole DC collection network, a second monopole DC collection network and a first bipole transmission system. The first monopole DC collection network aggregates positive-valued DC voltage outputs of a first cluster of renewable power generators onto a positive terminal of the first monopole DC collection network. The second monopole DC collection network aggregates negative-valued DC voltage outputs of a second cluster of renewable power generators onto a negative terminal of the second monopole DC collection network. The first bipole transmission system is coupled to the positive and negative terminals of the monopole DC collection networks, for transferring the aggregated power to a power grid substation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTDZÜRICH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bala, Sandeep Raleigh, US 18 112
Pan, Jiuping Raleigh, US 35 537

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00