Polymeric powder composition and a method of producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9765211
SERIAL NO

14782359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymeric powder composition prepared from an emulsion blend comprising from 95 to less than 100 percent by weight latex based substrate polymer, wherein the latex based substrate polymer comprises units derived from one or more monomers selected from the group consisting of alkyl (meth)acrylates, functionalized alkyl(meth)acrylates styrene, acrylonitrile, butadiene, chloroprene, vinyl chloride, (meth)acrylates, vinyl acetate, and combinations of two or more thereof and wherein the latex based substrate polymer has a Tg equal to or greater than 60° C. and an average particle size between 100 nm and 10 μm; and from greater than 0 to 5 percent by weight binder latex polymer, wherein the binder has a Tg of equal to or less than 10° C. and has units derived from one or more (meth)acrylic monomers, and wherein the binder polymer has an average particle size from 50 to 250 nm is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROHM AND HAAS COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adamo, Joseph R Souderton, US 3 21
Lundquist, Eric G North Wales, US 30 263
Nelliappan, Veera G North Wales, US 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00