Method and apparatus for widget and widget-container distribution control based on content rules

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9495084
APP PUB NO 20160041714A1
SERIAL NO

14684591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes receiving an instruction used to define a widget-container containing a service module associated with a widget. The widget-container is a procedural software framework configured to be executed at a widget-container processing device in response to a reference to the widget-container being accessed from a content aggregation point. The widget-container has a portion configured for receiving the widget. The method also includes determining whether processing of the widget within the portion of the widget-container is restricted and/or allowed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ORACLE INTERNATIONAL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, Stewart O Reston, US 12 565
Cosby, Scott F Rye, US 9 393
Debutts, Hasseltine R Upperville, US 3 53
Fath, John A Arlington, US 8 298
Keesan, Matthew J Washington, US 12 337
Radfar, Hooman Arlington, US 9 338
Reverte, Carlos F Miami, US 12 567

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00