Method for manufacturing silicon carbide semiconductor device and silicon carbide semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9627487
APP PUB NO 20160064490A1
SERIAL NO

14784560

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A silicon carbide substrate has first to third semiconductor layers. The first and third semiconductor layers have a first conductivity type, and the second semiconductor layer has a second conductivity type. A trench has a bottom surface and first to third side surfaces, the bottom surface being constituted of the first semiconductor layer, the first to third side surfaces being respectively constituted of the first to third semiconductor layers. A gate insulating film having a bottom portion and a side wall portion is provided on the trench. The bottom portion has a minimum thickness d0. A portion of the side wall portion on the second side surface has a minimum thickness d1. A portion, connected to the bottom portion, of the side wall portion on the first side surface has a thickness d2. Moreover, d2>d1 and d2>d0 are satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO ELECTRIC INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiratsuka, Kenji Osaka, JP 27 97
Masuda, Takeyoshi Osaka, JP 166 857
Saitoh, Yu Osaka, JP 47 174

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00