Technology for responding to remarks using speech synthesis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9685152
SERIAL NO

14892624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is provided with: a voice input section that receives a remark (a question) via a voice signal; a reply creation section that creates a voice sequence of a reply (response) to the remark; a pitch analysis section that analyzes the pitch of a first segment (e.g., word ending) of the remark; and a voice generation section (a voice synthesis section, etc.) that generates a reply, in the form of voice, represented by the voice sequence. The voice generation section controls the pitch of the entire reply in such a manner that the pitch of a second segment (e.g., word ending) of the reply assumes a predetermined pitch (e.g., five degrees down) with respect to the pitch of the first segment of the remark. Such arrangements can realize synthesis of replying voice capable of giving a natural feel to the user.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • YAMAHA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hisaminato, Yuji Hamamatsu, JP 8 67
Kawahara, Takehiko Hamamatsu, JP 14 74
Matsubara, Hiroaki Hamamatsu, JP 79 344
Ura, Junya Hamamatsu, JP 6 57
Yoshimura, Katsuji Hamamatsu, JP 74 1886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00