Methods and systems for processing cellulosic biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9790432
APP PUB NO 20160096995A1
SERIAL NO

14868435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Digestion of cellulosic biomass solids may be complicated by release of lignin therefrom. Methods and systems for processing a reaction product containing lignin-derived products, such as phenolics, can comprise hydrotreating the reaction product to convert the lignin-derived products to desired higher molecular weight compounds. The methods and systems can further include separating the higher molecular weight compounds from unconverted products, such as unconverted phenolics, and recycling the unconverted phenolics for use as at least a portion of the digestion solvent and for further conversion to desired higher molecular weight compounds with additional hydrotreatment. The methods and systems can further include a further hydrotreatment step configured for additional lignin conversion and/or a further hydrotreatment step configured for generating hydrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Philip Walter Bellaire, US 3 3
Chheda, Juben Nemchand Houston, US 62 529
Joffrion, Lamar Lane Sugar Land, US 9 22
Powell, Joseph Broun Houston, US 149 1397

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00