File load times with dynamic storage usage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9448727
APP PUB NO 20160098205A1
SERIAL NO

14967778

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a technique for improving file load times with dynamic storage usage. A file made up of data blocks is received. A list of storage devices is retrieved. In one or more iterations, the data blocks of the file are written by: updating the list of storage devices by removing any storage devices with insufficient space to store additional data blocks; generating a performance score for each of the storage devices in the updated list of storage devices; determining a portion of the data blocks to be written to each of the storage devices based on the generated performance score for each of the storage devices; writing, in parallel, the determined portion of the data blocks to each of the storage devices; and recording placement information indicating the storage devices to which each determined portion of the data blocks was written.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auvenshine, John J Tucson, US 53 300
Bartholomy, Erik Longmont, US 15 325
Olson, John T Tucson, US 83 895
Taljanovic, Nedzad Tucson, US 27 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00