Semiconductor structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9793124
SERIAL NO

14508237

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of fabricating a semiconductor structure comprise forming an opening through a stack of alternating tier dielectric materials and tier control gate materials, and laterally removing a portion of each of the tier control gate materials to form control gate recesses. A charge blocking material comprising a charge trapping portion is formed on exposed surfaces of the tier dielectric materials and tier control gate materials in the opening. The control gate recesses are filled with a charge storage material. The method further comprises removing the charge trapping portion of the charge blocking material disposed horizontally between the charge storage material and an adjacent tier dielectric material to produce air gaps between the charge storage material and the adjacent tier dielectric material. The air gaps may be substantially filled with dielectric material or conductive material. Also disclosed are semiconductor structures obtained from such methods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hopkins, John D Boise, US 236 646

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00