PHT powder coating materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9644065
SERIAL NO

14564159

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coating for an article may be made by applying a powder of a polyhemiaminal (PHA) polymer material to the article in a particulate form and then converting the PHA polymer material to a polyhexahydrotriazine (PHT) polymer material and fusing the particles into a monolithic coating by applying heat to the particles. The method generally includes forming a dilute reaction mixture comprising a formaldehyde reactant, a solvent, a primary aromatic diamine, and heating the reaction mixture to a temperature of between about 20° C. and about 120° C. for a short time to form a polymer. A particulate solid is precipitated by adding an excess volume of a non-solvent to the mixture. The powder may be applied to an article and then heated to fuse the powder into a coating and convert the PHA to PHT.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boday, Dylan J Tucson, US 268 1386
Garcia, Jeannette M San Jose, US 123 382
Hedrick, James L Pleasanton, US 294 1238
Wojtecki, Rudy J San Jose, US 156 703

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00