Electrical phase identification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9568522
SERIAL NO

14531845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical phase (e.g., a phase from among three-phase power) connected to an electrical meter may be determined. In one example of the techniques, changes in energy or power (e.g., a derivative or differences) may be determined based at least in part on measurements from each of a plurality of meters. Changes in energy or power may be determined based at least in part on electrical transmissions measured at each of the phases of a feeder. A meter may be selected from among the plurality of meters. For each of the plurality of electrical phases, the changes in energy or power measured by the meter may be compared or correlated to the changes in energy or power measured at the feeder. A phase that is connected to the meter may be determined, from among the plurality of electrical phases, based at least in part on the comparisons or correlations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ITRON, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aiello, Roberto Bend, US 26 716
Amihood, Patrick San Francisco, US 3 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00