Equipment front end module for transferring wafers and method of transferring wafers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9818633
SERIAL NO

14517623

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An EFEM useful for transferring wafers to and from wafer processing modules comprises an enclosure having a controlled environment therein bounded by a front wall, a back wall, first and second side walls, a top wall, and a bottom wall. The first side wall and the second side wall include two or more wafer load ports wherein each wafer load port is adapted to receive a FOUP. The front wall includes wafer ports configured to attach to respective load locks operable to allow a wafer to be transferred to a front wall cluster processing tool. The back wall includes a wafer port adapted to be in operational relationship with a back wall cluster processing tool. A robot in the EFEM enclosure is operable to transfer wafers through the wafer load ports, the first front wall wafer port, the second front wall wafer port, and the back wall wafer port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey,, III Andrew D Pleasanton, US 109 2271
Bultman, Gary Los Altos, US 29 1723
Kristoffersen, Candi San Jose, US 7 35
Lill, Thorsten Santa Clara, US 99 3350
Raghavan, Rangesh Fremont, US 1 15
Shen, Meihua Fremont, US 69 2324
Vahedi, Vahid Oakland, US 47 1909

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00