Battery terminal, method for manufacturing battery terminal, and battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10193126
APP PUB NO 20160118641A1
SERIAL NO

14921344

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery terminal includes a shaft portion and a flange portion. The battery terminal is made of a clad material in which at least a first metal layer and a second metal layer are bonded to each other. Each of the shaft portion and the flange portion includes the first metal layer on a first side in a shaft direction and the second metal layer on a second side in the shaft direction. The first metal layer in the shaft portion includes a protruding portion that further protrudes to the second side in the shaft direction with respect to a surface of the first metal layer on the second side in the shaft direction in the flange portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI METALS LTD; AOYAMA SEISAKUSHO IBARAKI PLANT CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Naonori Hitachinaka, JP 2 5
Ishio, Masaaki Tokyo, JP 41 237
Nakano, Hirofumi Hitachinaka, JP 85 966
Oda, Yoshimitsu Suita, JP 27 104
Yamamoto, Masaharu Suita, JP 31 313

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00