Solar photovoltaic-thermal collector assembly and method of use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9401676
SERIAL NO

14989250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar collector assembly includes a photovoltaic panel having first and second sides, a frame, and a first gas-filled chamber on the first side of the photovoltaic panel. The first gas-filled chamber is at least partially defined by a portion of the frame and by a portion of the first side of the photovoltaic panel. A gas functions as a heat exchange fluid and collects heat from solar energy and/or heat generated by the photovoltaic panel. The photovoltaic panel accumulates and converts solar energy to electrical energy. The solar collector assembly may include a second gas-filled chamber provided on the second side of the photovoltaic panel. The second gas-filled chamber is at least partially defined by a portion of the frame and by a portion of the second side of the photovoltaic panel. Solar collector systems and methods of generating electrical energy and/or thermal energy are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WILLIAMS DOUGLASCOLUMBIA SC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Williams, Douglas Northbrook, US 65 746

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00