Battery-powered debris blower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10327392
APP PUB NO 20160120131A1
SERIAL NO

14933527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A debris blower, having a fan frame, with a back plate and a motor plate, the back plate and motor plate being connected to and separated by a side wall. A fan assembly is positioned within the fan frame, and is rotated by a motor. A controller is electrically connected to the motor and to a battery pack, to energize the motor. A vehicle mounting plate is connected to a vehicle, and a blower mounting plate is connected to the fan frame, so as to removably connect the blower to the vehicle. A mounting tube is connected to the vehicle mounting plate. The blower mounting plate includes at least one hook for connecting with the mounting tube. The blower mounting plate may further include flange extensions to contact the vehicle mounting plate. The direction of the outlet of the blower can be remotely controlled by the operator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAC POWER SYSTEMS INCS45 W29290 HWY 59 WAUKESHA WI 53189

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Conrad, Joseph C Okeana, US 8 130
Conrad, Matthew C Okeana, US 7 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00