Power supply system and motor car

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9461307
APP PUB NO 20160126546A1
SERIAL NO

14994842

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply system includes a first battery module and a second battery module. The first battery module comprises a first nonaqueous electrolyte battery comprising a negative electrode containing a carbonaceous material. The second battery module comprises a second nonaqueous electrolyte battery comprising a negative electrode and a positive electrode. The negative electrode contains a negative electrode active material that has a lithium ion absorbing potential of 0.4V (vs. Li/Li+) or more and an average particle diameter of 1 μm or less. The positive electrode contains lithium metallic oxide represented by LixCoyM1−yO2. The second battery module is chargeable in a range of 20 to 80% of charging depth so that a charging current density (A/kg) of the second nonaqueous electrolyte battery becomes higher that that of the first nonaqueous electrolyte battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Yasuhiro Yokohama, JP 333 1741
Inagaki, Hiroki Kawasaki, JP 256 3505
Takami, Norio Yokohama, JP 489 5231
Tatebayashi, Yoshinao Yokohama, JP 48 1037

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00