Process and apparatus for manufacturing blown optical fibre units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10611682
SERIAL NO

14893996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for manufacturing an optical fibre unit for air-blown installations includes: providing a deposition chamber for applying particulate material, the deposition chamber having an inlet end and an outlet end and a longitudinal axis; passing through the deposition chamber an optical fibre assembly including at least one optical fibre embedded in an inner layer of cured resin material, and having an outer layer around the inner layer, the outer layer including uncured resin material; injecting a flow of fluid and particle material in the chamber in a direction substantially parallel to the chamber longitudinal axis, at an injection speed of 5 m/s at most; perturbing the flow when in the chamber, thus causing the particle material to impact and partially embed into the outer layer of the optical fibre assembly; and curing the outer layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRYSMIAN S P A20126 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lang, Ian Dewi Milan, IT 21 70
Mason, Mark Richard Milan, IT 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00