Phase difference film, polarization plate, and liquid crystal display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10215899
APP PUB NO 20160131809A1
SERIAL NO

14995671

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquid crystal (LC) display device uses a phase difference film which increases front contrast of the device, and a polarization plate. The film includes a first optical anisotropic layer, and a second optical anisotropic layer thereon, the first layer formed by fixing an LC compound in a homogeneous alignment state, has an order parameter (OP) of 0.75 to 0.95, and layer thickness of 0.3 μm to 3.0 μm, the second layer formed by fixing an LC compound in a homeotropic alignment state, has an OP of 0.60 to 0.95, and layer thickness of 0.3 μm to 3.0 μm, the OP which is denoted by OP=(A−A⊥)/(2A⊥+A), “A” which represents absorbance of the LC compound regarding light polarized parallel to an alignment direction, and “A⊥” which represents absorbance of the LC compound regarding light polarized vertical to the alignment direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJIFILM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Yoji Kanagawa, JP 94 1242
Katoh, Shunya Kanagawa, JP 81 199
Nagai, Michio Kanagawa, JP 123 2350
Suzuki, Masaya Kanagawa, JP 90 465
Takeda, Jun Kanagawa, JP 130 794

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00