Control of base cutter height for multiple row sugar cane harvesters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9781880
SERIAL NO

14898400

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multiple row sugar cane harvester having automatic and independent control of multiple base cutters utilized to severe sugar cane stalks in adjacent rows. Position sensors sense the height of the base cutters relative to the chassis of the sugar cane harvester and feed the signals to a controller for adjusting the height to a preselected level. The base cutters are individually driven by hydraulic motors through individual hydraulic circuits and the operating pressure is sensed and fed to the controller for determining whether a choke condition exists. A load sensor is incorporated between the linkage and the sugar cane harvester chassis for determining whether the base cutters have ground contact to elevate the base cutters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CNH INDUSTRIAL AMERICA LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cleodolphi, Daenio Piracicaba, BR 17 63
Fagundes, Adriano Curitiba, BR 1 12
Sarchi, Ramon Piracicaba, BR 1 12
Tanaka, Fabio Piracicaba, BR 1 12
Verstraete, Jan Poperinge, BE 11 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00