Seven-level inverter apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9685884
APP PUB NO 20160141977A1
SERIAL NO

14895626

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is composed of a three-phase three-level inverter 1, three single-phase five-level inverters 2, each of which is connected in series with an output of each phase of the three-phase three-level inverter 1, and pulse width modulation control means 8 provided for each phase which supplies gate pulses to the three-level inverter 1 and the single-phase five-level inverter 2 of the relevant phase. State transition means 84 which determines an output of a switching leg of the three-level inverter 1, and outputs of outside and inside switching legs of the single-phase five-level inverter based on transition of a voltage level created by the pulse width modulation control means 8, makes all of the three outputs of the three-level inverter 1, and the outside and inside switching legs of the single-phase five-level inverter 2 0 or positive, when the voltage level is positive, makes all of the outputs of these three legs 0 or negative, when the voltage level is negative, and makes all of the outputs of these three legs 0, when the voltage level is 0.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oka, Toshiaki Tokyo, JP 24 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00