Elevator installation and a method for controlling elevators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9533858
APP PUB NO 20160145075A1
SERIAL NO

15011143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an elevator installation and also to a method for controlling elevators. In the method a run plan is formed for driving elevator cars on the basis of service requests, the elevator cars are driven according to the run plan, by supplying electric power via the electricity distribution network of the building to a hoisting machine driving an elevator car, and also by supplying electric power from a hoisting machine braking an elevator car back to the electricity distribution network of the building, alternatives for a run plan are formed for driving elevator cars on the basis of service requests, the electric power which the hoisting machines need for implementing the aforementioned alternatives is determined, and also a run plan is selected for use from the plurality of different alternatives, when implementing which run plan the electric powers of the hoisting machines, when summed together, smooth the power variation occurring in the electricity supply of the building.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KONE CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hanninen, Ari Hyvinkaa, FI 11 68
Tyni, Tapio Hyvinkaa, FI 49 533

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00