Data transfer between multiple databases

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9892180
SERIAL NO

14549589

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A parallel track/sector switching device and associated method is provided. The method includes identifying data replication sources and locating data replication targets associated with the data replication sources. Data replication instances associated with moving data from the data replication sources to the data replication targets are determined. A first data replication instance for moving first data from a first data replication source to a first data replication target is determined and an antenna capacity associated with the first data replication source and the first data replication target is identified. A memory to track ID map associated with a storage device of the first data replication target is identified and it is determined if a last replication slot has been allotted to the first data replication target based on the memory to track ID map.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abrahams, Faried Laytonsville, US 49 192
Sivakumar, Gandhi Bentleigh, AU 305 1101
Thomas, Lennox E Decatur, US 6 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00