Assembled battery and manufacturing method of assembled battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10062880
APP PUB NO 20160149175A1
SERIAL NO

14947541

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembled battery includes: a holder including a plurality of cell hold portions each having a first surface and a second surface facing an opposite side to the first surface and each having a holding hole, which is a hole penetrating through between the first surface and the second surface, and a connection portion that connects the plurality of cell hold portions to each other; a plurality of cells each having an outside diameter smaller than an inside diameter of the holding hole and inserted into the holding hole of each of the plurality of cell hold portions; and an adhesive provided so as to be solidified in a gap between an outer peripheral surface of a part of the cell which is placed inside the holding hole and an inner peripheral surface of the cell hold portion which constitutes the holding hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morimitsu, Takatoshi Toyota, JP 12 9
Okura, Toshinori Toyota, JP 21 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00